Bay Shore Apartment Complex Rehab (Beaver Dam, WI) - EnduraMax

在海湾岸边公寓楼的照片之前和经过enduramax墙系统的照片

As part of Wisconsin's "Focus on Energy" program, father and son property management team, building owners, and general contractors, Col. Pete and Clancy Knaup began a major energy retrofit of their Beaver Dam, WI, three-story Bay Shore apartment complex in early 2011. A major aspect of the remodel included removing the old plywood siding and replacing it with the EnduraMax High Performance Wall System. Thus far, their efforts have garnered over $120,000 in federal tax credits.

“部分资格流程包括在每个单位上进行鼓风机门测试,”Col.Knaup说。“如果测试只测量了建筑物信封,我们将获得更多资格。不幸的是,由于内部管道追逐,我们发现楼层之间的内部空气泄漏,伤害了我们的案例。”

Because the Knaups are still in the process of fine-tuning other energy retrofitting aspects of the complex, such as the plumbing and HVAC systems, they have not yet compiled data on the overall energy consumption savings. However, Col. Knaup noted that the tenants have reported feeling more comfortable. In addition, he personally noticed that the heating system has not yet turned on in this early Fall season cool down as in past years and attributes much of the difference to the added insulation of EnduraMax.

后退 下载PDF.